Image from Google Jackets

Present and future cost of alkaline and PEM electrolyser stacks

Tipo de material: TextoTextoSeries ; International Journal of Hydrogen Energy, 48, p.32313-32330, 2023Trabajos contenidos:
  • Krishnan, S
  • Koning, V
  • De Groot, M. T
  • De Groot, A
  • Mendoza, P. G
  • Junginger, M
  • Kramer, G. J
Tema(s): Recursos en línea: Resumen: We use complementary bottom-up and top-down approaches to assess the current cost of AE and PEM stacks and how the costs are expected to come down by 2030. The total AE and PEM stack cost reduce from a range of 242-388 _/kW and 384-1071 _/kW in 2020 to 52-79 _/kW and 63-234 _/kW in 2030 respectively. The main drivers of these cost reductions are an increased current density and a reduction and/or replacement of expensive materials with cheaper alternatives. To a lesser extent, manufacturing and labor costs reduction is expected due to mass manufacturing at a GW scale. The total cost decrease is less prominent for AE than PEM due to AE's maturity. The uncertainty range for PEM stacks is due to the low TRL associated with the advanced design PEM stack.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode
Documentos solicitados Documentos solicitados CICY Documento préstamo interbibliotecario Ref1 B-20866 (Browse shelf(Opens below)) Available

We use complementary bottom-up and top-down approaches to assess the current cost of AE and PEM stacks and how the costs are expected to come down by 2030. The total AE and PEM stack cost reduce from a range of 242-388 _/kW and 384-1071 _/kW in 2020 to 52-79 _/kW and 63-234 _/kW in 2030 respectively. The main drivers of these cost reductions are an increased current density and a reduction and/or replacement of expensive materials with cheaper alternatives. To a lesser extent, manufacturing and labor costs reduction is expected due to mass manufacturing at a GW scale. The total cost decrease is less prominent for AE than PEM due to AE's maturity. The uncertainty range for PEM stacks is due to the low TRL associated with the advanced design PEM stack.

There are no comments on this title.

to post a comment.