Assessment of levelized costs for green hydrogen production for the national refineries system in Mexico (Record no. 55165)
[ view plain ]
| 000 -LEADER | |
|---|---|
| fixed length control field | 02596nam a2200241Ia 4500 |
| 003 - CONTROL NUMBER IDENTIFIER | |
| control field | MX-MdCICY |
| 005 - DATE AND TIME OF LATEST TRANSACTION | |
| control field | 20250625162501.0 |
| 040 ## - CATALOGING SOURCE | |
| Transcribing agency | CICY |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) | |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) | B-21087 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
| fixed length control field | 250602s9999 xx |||||s2 |||| ||und|d |
| 245 10 - TITLE STATEMENT | |
| Title | Assessment of levelized costs for green hydrogen production for the national refineries system in Mexico |
| 490 0# - SERIES STATEMENT | |
| Volume/sequential designation | International Journal of Hydrogen Energy, https://doi.org/10.1016/j.ijhydene.2024.03.316, 2024 |
| 520 3# - SUMMARY, ETC. | |
| Summary, etc. | This paper presents a techno-economic feasibility study exploring the Levelized Cost of in-situ green hydrogen production in Mexican refineries. With hydrogen comprising over 90 percent of national consumption in the petrochemical industry, the research analyzes the renewable energy potential of Mexico to sustain hydrogen production in six operational refineries and the recently inaugurated Dos Bocas refinery. The study outlines the potential for green hydrogen production, transportation, and storage, emphasizing its application in petrochemical processes over short, medium, and long-term transitions to green, sustainable hydrogen production. The study reveals significant results, with the Salamanca refinery demonstrating the most competitive cost for solar PV energy production. Additionally, the Salina Cruz refinery proves to have the most competitive energy cost for wind power production, followed closely by Dos Bocas. Furthermore, the research indicates that as solar PV technology costs continue to decrease, the use of solar PV could result in cheaper green H2 even in regions with abundant wind resources like Salina Cruz. The study also shows that a grid-interconnected Power-to-Gas (P2G)system can have a reduction on the Levelized Cost of Hydrogen (LCOH), owed to income generated from energy exportation. This scheme must be further analyzed as a way to increase competitiveness of power to gas systems; even as a mean to indirectly subsidize the operational costs of the green H2 plant during the initial phase of a new project for a refinery. These findings offer valuable insights into the potential for in-situ green hydrogen production and its economic viability within Mexico's petrochemical industry. |
| 650 14 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| Topical term or geographic name entry element | GREEN HYDROGEN |
| 650 14 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| Topical term or geographic name entry element | LCOH |
| 650 14 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| Topical term or geographic name entry element | REFINERIES |
| 700 12 - ADDED ENTRY--PERSONAL NAME | |
| Personal name | De La Cruz-Soto, J. |
| 700 12 - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Azkona-Bedia, I. |
| 700 12 - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Cornejo-Jimenez, C. |
| 700 12 - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Romero-Castanon, T. |
| 856 40 - ELECTRONIC LOCATION AND ACCESS | |
| Uniform Resource Identifier | <a href="https://drive.google.com/open?id=1BLHRlZNvaWN4V8uXbAMaP3UBB99tAv9v&usp=drive_copy">https://drive.google.com/open?id=1BLHRlZNvaWN4V8uXbAMaP3UBB99tAv9v&usp=drive_copy</a> |
| Public note | Para ver el documento ingresa a Google con tu cuenta: @cicy.edu.mx |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
| Source of classification or shelving scheme | Clasificación local |
| Koha item type | Documentos solicitados |
| Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection | Home library | Current library | Shelving location | Date acquired | Total checkouts | Full call number | Date last seen | Price effective from | Koha item type |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Clasificación local | Ref1 | CICY | CICY | Documento préstamo interbibliotecario | 25.06.2025 | B-21087 | 25.06.2025 | 25.06.2025 | Documentos solicitados |
